What is connection and schedule risk?

Renewable Energy

It is the possibility that the Network Operator takes longer to approve the connection, install the bidirectional meter or sign the connection agreement.

For the investor: every month of delay is a month without project revenue. It is the risk that most often moves the date of the first distribution.