What is geographic dispersion in a solar project?

Renewable Energy

It is the maximum distance UPME allows between the consumption points of a collective self-generator's members.

For the investor: if the points are too far apart, the project does not qualify as an AGRC. It is an eligibility requirement, not a design suggestion.

Need help?
What is geographic dispersion in a solar project? | FAQ | Circular Urban