Renewable Energy · Basic level · 3 min read ·
What is the Energy Communities Registry (RCE)?
The Energy Communities Registry (RCE) is the official list of the country's energy communities, kept by the Ministry of Mines and Energy. Decree 2236 of 2023 created it. Being registered is what lets a community access the public programs and funds designed for them.
In 30 seconds
- The Ministry of Mines and Energy runs it; Resolution 40332 of 2026 sets how it works.
- Registration is a requirement: without it, the community can't access the program's benefits.
- Having panels installed doesn't replace registration: they are separate steps.
Full guide
What is an Energy Community in Colombia
The framework created by Law 2294 of 2023: how a group of neighbors and businesses share a solar farm, without installing anything or changing electricity company.
Read the guideWhy should you care?
An energy community exists in practice once it produces energy, but it exists for the government once it appears in the RCE. The support it can reach depends on that.
- You know what to check before assuming a community gets public support.
- You tell a formal community apart from a group of neighbors with panels.
- You understand why the paperwork can weigh on the schedule as much as the build.
Think of it as a school enrollment
A child can sit in on classes, but without enrollment they are not on the lists, get no certificate and can't join the school's programs. The RCE is the energy community's enrollment.
How does the Energy Communities Registry work?
- 1
The community organizes
A group of users formally joins to generate, share or use energy from renewable sources, as Decree 2236 of 2023 defines.
- 2
It registers with the Ministry
It submits its information to the RCE, following Resolution 40332 of 2026. It must be registered before requesting connection as a collective self-generator.
- 3
It becomes visible to the government
Once registered, it can apply to public programs and funds aimed at energy communities.
- 4
It keeps its data current
Changes in members or projects are updated in the registry.
An example with numbers
Two neighboring communities install similar solar systems at their schools. Only one completes its RCE registration. Illustrative example.
| Community A: panels installed | Yes |
|---|---|
| Community A: registered in the RCE | Yes |
| Community A: can apply to public programs | Yes |
| Community B: panels installed | Yes |
| Community B: registered in the RCE | No |
| Community B: can apply to public programs | No |
The panels are the same; the registry is what differs. For the government, only community A is an energy community.
Where do you see it at Circular Urban?
The solar projects Circular Urban publishes today are structured as a company (SPV) that sells energy under contract, not as an energy community. A community and an SPV can coexist in the same project; if a project includes a community, its sheet states whether it is registered in the RCE.
- Each solar project's sheet, under Regulatory Framework: Decree 2236 of 2023 and Law 2294 of 2023.
- In Learn, under FAQ: the difference between an energy community and an SPV.
What changes in your finances once you get it
You verify before believing
If a project says it has support for energy communities, ask whether the community is already in the RCE.
You keep the roles apart
In a community you take part as an energy user; in an SPV, as a shareholder of the company.
You count the paperwork in the timeline
Registering takes time; a realistic schedule includes it alongside the build.
Common mistakes
- Myth
Installing the panels already makes you an energy community.
- In reality
You must organize formally and register in the RCE for the government to recognize you as one.
- Myth
Being in the RCE means you will receive public funds.
- In reality
Registration lets you apply to programs; each program has its own requirements and limits.
- Myth
An energy community is a company.
- In reality
It is not a corporate form. It is a way to use energy collectively and can coexist with a company that owns the asset.
Test yourself
A community's panels are already producing, but it isn't in the RCE. What does it need to access public programs for energy communities?
Keep learning
This content is educational. Every participation carries risks inherent to the project, including the possibility of partial or total loss, and results are subject to each project's actual performance.