CREG is Colombia's Comisión de Regulación de Energía y Gas, the energy and gas regulator. It writes the electricity sector's rules: how the tariff you pay is worked out, how a system connects to the grid and how surplus energy from a solar rooftop is settled. It doesn't generate or sell energy: it sets the rules of the game.

In 30 seconds

  • It defines the formula used to compute the energy tariff.
  • It sets the technical and commercial conditions for connecting to the grid.
  • It establishes how self-generation surplus is recognized.
01

Why should you care?

What a solar project receives for its energy depends partly on rules CREG writes. If those rules change, the project's numbers can change too.

  • You understand what your energy bill is made of.
  • You know why regulatory risk shows up in solar projects.
  • You read news about sector resolutions knowing who they affect.
02

Think of it as the referee and the rulebook

In a match, the teams play and the crowd watches, but the rulebook says what counts. CREG writes that rulebook for energy: it doesn't play, but every move in the sector is measured against its rules.
03

How does CREG work?

  1. 1

    It proposes a rule

    It publishes a draft resolution so companies and citizens can comment.

  2. 2

    It takes comments and adjusts

    It reviews the feedback and settles the final text.

  3. 3

    It issues the resolution

    The rule takes effect and binds generators, grid operators and retailers.

  4. 4

    It is applied to tariffs and the grid

    Companies compute the tariff with CREG's formula and connect users under its conditions.

The formula

CU = G + T + D + Cv + PR + R

CU
= unit cost of supplying the service, per kWh
G and T
= generation and transmission
D and Cv
= distribution and retail
PR and R
= grid losses and constraints
04

An example with numbers

How one kWh of the tariff splits across its components, if the unit cost is 100 units. Illustrative figures, not the tariff of any market.

An example with CREG
Generation (G)40 units
Transmission (T)8 units
Distribution (D)30 units
Retail (Cv)12 units
Losses and constraints (PR + R)10 units
Unit cost (CU)100 units

Generating the energy is only part of the price. Getting it to you costs too, and CREG defines how each part is recognized.

05

Where do you see it at Circular Urban?

Solar projects operate under CREG's resolutions on self-generation, connection and surplus, and quote them in their regulatory framework. A change in those rules is one of the risks each project describes.

  • Each solar project's sheet, under Regulatory Framework: CREG Resolutions.
  • Each solar project's sheet, under Risks & Mitigants.
06

What changes in your finances once you get it

You read your bill

You know your tariff adds up generation, transport, retail and losses, not just the energy.

You place regulatory risk

You understand a new resolution can change how a project's energy is paid for.

You follow rules, not rumors

Before drawing conclusions from a news story, you check whether it is a draft resolution or a rule in force.

07

Common mistakes

Myth

CREG sells energy or directly sets what you pay.

In reality

CREG sets the formula; companies compute your tariff with it based on their recognized costs.

Myth

CREG and UPME do the same thing.

In reality

CREG regulates; UPME plans the sector and certifies projects.

Myth

A CREG rule applies as soon as it is announced.

In reality

It is usually published first as a draft for comments. Only the final resolution is binding.

08

Test yourself

In the tariff formula, which component covers carrying energy over the local grids to your home?

09

Keep learning

This content is educational. Every participation carries risks inherent to the project, including the possibility of partial or total loss, and results are subject to each project's actual performance.

Related projects

These are the Circular Urban projects where what you just read applies.

PPA Solar Energy - Subway La PintadaProject in Structuring

PPA Solar Energy - Subway...

Renewable Energy

La Pintada, Colombia

Total project value$146,747,250 COP
Min. Investment$500,000 COP
La Caucana Solar FarmProject in Structuring

La Caucana Solar Farm

Renewable Energy

La Pintada, Colombia

Total project value$5,687,197,597 COP
Min. Investment$500,000 COP
Need help?